top of page
Rerating-Turbines2.png

ENGINEERING & REFURBISHMENT

Refub11A.png
Cogs

LAUJIR INDIA
SERVICES FOR ENGINEERING

  • Engineering and Support

  • Erection and Commissioning

  • Overhauls and Refurbishment

  •  spares and subassemblies

  • Trouble shooting services

  • Gas Turbines Exhausted Frames

  • Operational  Problems

  • Vibration and Noise Analysis

  • Refurbishment of  Gears , Pinion Shaft, Bearings , Clutches Etc.

Ultrasonic Testing of Compressor Rotor

Compressor-testing.png
Compressor-testing1.png
Compressor-testing3.png
Compressor-testing4.png
refub13.png

SOLUTION
ASSURANCE

REFURMISHMENT & REVERSE  ENGINEERING PROCESS

Preliminary Discussion

Submit Technical Competence

Technical Meeting-Collect name plate details, drawings, etc.

Submit initial techno-commercial proposal (assuming standard material) & finalize

Depute engineer for dimensions otherwise parts for reverse engineering including one for destructive testing

Testing and submitting the results with commercial implications if any.

Prepare drawings and submit for comments and approval

Manufacture parts

High speed balancing by providing vendor details to customer

Customer commissions the parts in the existing machine by replacing the existing part (available for backup) with the parts supplied under our supervision

Customer runs the machine with the spares supplied to check the perfromance

Once proven, we discuss for regular supplies

Same step for reverse engineering and other rotating equipment

RERATING
TURBINES

Refub10.png

Result
Validation

Solution
Formulation

Understanding
Problem

REVERSE
ENGINEERING
TECHNOLOGY

Gathering
Historical Data

Site
Observation
& Assessment

Problem 
Analysis by
OFT

REVERSE ENGG.

REFURBISHMENT

PROBLEM ANALYSIS

RERATING

Range Up to 650 MW

Engineering  Support  for Gas and Steam Turbines,  BFWP  and Centrifugal compressors, Gear Boxes

Erection and Commissioning, Operational Problems

Spares, overhauls, subassemblies  and Refurbishment, reverse engineering for    Gas and Steam Turbines, BFWP, Compressors, Gear Boxes, Gas Turbines Exhausted Frames

Trouble shooting, Vibration and Noise Analysis

Enhancement of capacity of existing steam turbines by reengineering the complete steam path

Clip3.png

SUPPLY CHAIN
MANAGEMENT

To Achieve Competitive Advantage By  Managing  Materials and Services

At  Right Time With Best Quality & Effective Cost

Objective

Quick Response To

Reduce

Improve Quality of

• Resolve Complaints to Customer Satisfaction.

• Change in Prod Program.

• Lead Time

• Material Cost

• Inventory Cost

• Raw materials

• Bought outs

• Services

Establish Methods & Procedures, which Plans, Organize , Co-ordinate , Control and review the flow of Material & Services from suppliers to TBG and to final users

bottom of page